Programme

Conference Day 2 Wednesday 27 November 2019 Download
08:00Registration and refreshments
08:45Welcome back from the chair
09:00Retrofitting Digital Substations – effectively integrating next generation digital substation technology with legacy infrastructure
09:45Optimising the Engineering Process – reducing the time and cost of engineering multi-vendor multi-edition digital substations through advanced configuration management
  • Pablo Humeres Flores
    Pablo Humeres Flores
    Head of Automation Systems of Substations, Power Plants and Control Centers, Eletrosul Brazil
10:30Morning refreshments, networking and exhibition
11:00Technology Innovation Panel: benchmarking next generation substations systems, components, features and functionalities
12:30Lunch, networking and exhibition
14:00Advanced Testing for Multi-Vendor Systems – fully automating the system testing procedure to ensure an efficient and cost-effective approach for next generation digital substations
14:453rd Party Testing Tools – examining how vendor-independent testing tools are being developed to support the effective design, installation and testing of multi-vendor digital substations systems
  • Alex Apostolov
    Alex Apostolov
    Principal Engineer, OMICRON Editor-in-Chief, PAC World
15:30Afternoon refreshments, networking and exhibition
16:00IEC 61850 and the Process Bus – reducing costs and improving safety through advanced implementation of the Process Bus
16:45Real-time Monitoring & Control – applying real-time capability to the monitoring and control of next generation substation assets
17:30Data Management & Analytics – utilising high volumes of grid data to generate deep operational insights and drive grid efficiency in a secure and reliable manner
18:15End of conference day two