Chat with us, powered by LiveChat
Demonstrating the full value of CIM to secure investment and speed up wide-scale implementation
21-23 January 2020 | Amsterdam, The Netherlands

Programme

Conference Day 2 Wednesday 22 January 2020 Download
08:00Registration and refreshments
08:45Welcome back from the Chair
09:00Applying ISO 55000 and PAS1192 with CIM - achieving reliable enterprise level integration with internal and external IT systems that is compliant with Global Asset Management Standards
  • Jayaprakash Poraj
    Jayaprakash Poraj
    Senior Power Network Protection Specialist, Abu Dhabi Transmission and Despatch Company
09:45Applying IEC 61968 – understanding how CIM is being applied as DER integration accelerates within a more flexible grid environment
10:30Morning refreshments, networking and exhibition
11:00Technology Innovation Panel – evaluating the tools and technologies being developed to support CIM based system integration in the smart utility environment
  • Muhammad Barbar
    Muhammad Babar
    Consultant Digital Grid Operations, DNVGL
  • michael covarrubias
    Michael Covarrubias
    Director of Market Strategy and Solutions, Xtensible CIM User Group Vendor Co-Chair, IEC
  • Senior Representative
    Alan McMorran
    Director, Open Grid Systems Member, IEC TC 57 WGs 13, 14 and 16
12:30Lunch, networking and exhibition
14:00 Applying IEC 62325 – leveraging CIM to manage the influx of high-volume real-time data in support of risk management and energy trading in the evolving grid
14:45Leveraging GIS for UML Modelling – accurately mapping attributes within a variety of complex grid architectures to ensure consistent interpretation of CIM
  • Senior Representative
    Yiannakis Ioannou
    Assistant Networks Manager and GIS Co-ordinator, Electricity Authority of Cyprus
15:30Afternoon refreshments, networking and exhibition
16:00TSO-DSO data exchange using CIM – understanding the development of the H2020 TDX-ASSIST Project to drive greater TSO-DSO market data exchange
  • Eric Lambert - EDF
    Eric Lambert
    Senior Research Engineer and Project Manager, EDFMember, IEC TC 57 WGs 13, 14 and 16
16:45CIM Configuration – simplifying the configuration process to support timely and cost-efficient implementation of the CIM standard
17:30End of day two